HOME / SERVICES
FROM SYSTEM SELECTION TO THE JOINT ON SITE
Lamination, advice and training for GRP/GRE
We are not the lead designer or an engineering, procurement and construction (EPC) contractor. We complement the design team with composite expertise from the front-end engineering design (FEED) stage.
DISCUSS YOUR PROJECT ↗01 / DECISIONS WE HELP YOU MAKE
One poorly made joint can affect the entire line.
For bonded and laminated joints, surface preparation, material batches, mixing, curing temperature and records all matter. Each manufacturer has its own procedure.
A lamination, bonding or repair procedure is not a generic public guide. It is prepared for your system and project.
JOINT QUALITY / FIVE CHECKPOINTS
Steel or pe experience alone is not enough for a GRP/GRE joint.
Every step affects the quality of bonded and laminated joints. Training relates to a specific technology, not to general ISO certification.
01
Surface
Abrasion, geometry, cleanliness and dryness.
02
Materials
Correct material kit, batch, storage and working life.
03
Mixing
Component ratio, quantity and uniformity.
04
Curing
Temperature, humidity and the required wait before testing.
05
Records
Inspection points, documentation and pressure testing.
02 / BY TASK
Five ways ZEFYR can contribute.
01
Technical advice
Fluid, temperature, pressure, route and project requirements. DN and PN are not enough for pricing.
Discuss your requirements ↗02
Site support
Joint supervision, inspection points and documentation. We agree the scope and responsibilities in advance.
Request support ↗03
Prefabrication and modifications
Non-standard components and modifications to drawings. The scope is agreed for the actual line, not guessed.
Discuss the scope ↗04
Repairs and training
Training relates to a specific joining technology. A ZEFYR training record confirms its scope and skills assessment; it is not independent ISO certification.
Discuss your needs ↗05
Lamination work
Joint lamination, modifications and repairs to composite components in accordance with the specific system documentation. Scope and working conditions are agreed in advance.
Request lamination work ↗03 / PROJECT CONTEXT
Joint quality depends on the team, components and site conditions.
Composite joints are made in real site conditions. We account for access, weather, shutdowns and the skills of the people carrying out the work.



04 / FIRST CONTACT
Tell us what is holding you back. The full design can follow.
Start with the issue, location and support you need. We will clarify the other details together.
01
System selection, joining, repair or training
02
Location and stage: design, procurement or construction
03
What exactly you need us to do
Request technical advice or GRP/GRE installer training.
We do not replace the project designer. If a composite is unsuitable for the application, we will say so.